Wow!  Four weeks have already zoomed past.

July 23rd, Sunday 

It was another wonderful weather day.  Despite the missing supplies, John made more progress.  He secured the parallam beams and made temporary adaptations for the missing pieces.  Lally columns were cut to the individual lengths and Keith helped John move them to their respective footings in the basement.  John and Keith also worked on moving more stone and backfill into needed areas.
Mary Ann couldn't turn the pipe cutter, but she kept the vise from tipping off the sawhorse.

 
July 24th, Monday

It was a late start this morning, 7:30.  We set nine of the eleven Lally columns in place under the beams.  John took a break and used the backhoe to spread stone for a driveway approach.  After we returned the backhoe, we found out that the exterminator was coming to do the termite treatment.  Word was left on the answering machine that some of the missing materials would arrive tomorrow.   We completed setting the remaining two Lally columns in the afternoon.  John worked on putting some of the rim boards on the foundation and installed several floor joist in the sun room area.  Keith and John sorted and stacked the remaining floor joists for easier use.  Another delay, the masons wouldn't be able to pour the floors until Saturday the earliest.

John and Mary Ann had all eleven Lally columns in place by the afternoon.  Mary Ann did a great job holding and steadying while John lifted and whacked the columns into alignment.
 
July 25th, Tuesday

John fastened more floor joists in place over the sun room area.  Until the missing parallams arrive he is limited as to what he can do.  Keith and Perry came over to help, but there wasn't much to do.   Another disappointment, the corrected order will not arrive until Wednesday.  The remaining rim boards are completed.  Reinforcing wire was purchased for the masons and clean up and sorting of the remaining material was continued.

Keith and Perry checking on Dad's progress.  It is slow going.

 

July 26th, Wednesday  -- Dylan's Birthday

It was good to have Stephanie and Nicholas up to celebrate Dylan's birthday.  Too bad Perry couldn't stay.  The remaining parallams and joists were delivered.  Keith helped John measure, cut, and move the two remaining sections of beams into place.  We took a break from the house and enjoyed Dylan's birthday party.

Stephanie and Nicholas were able to watch the unloading of these supplies
Dylan seemed to enjoy all aspects of his birthday party.  He had a construction cake, time to play with family members and help from Alexandria with opening gifts.
 
July 27, Thursday

Mary Ann and John worked on more floor joists.  The form of the lower level was finally taking a real shape.  There had to be sections left open for the basement floor to be poured, but the majority of the the first level floor joists are in place.

One piece at a time the house is taking shape.
 
July 28th, Friday

Today was cloudy and the prospects of rain are increasing.  John doubled checked some measurements and had to make corrections because of errors in alignment of the foundation walls.  Two of the floor joists had to taken out, shortened and realigned.  He also worked on framing out the stairwell opening.  Mary Ann continued on the site clean up.  This is probably the neatest construction site in Kentucky.

July 29th, Saturday

Today was a total wash out.  There was steady and sometimes heavy rain all day.  John got some masonry supplies, but there was little that could be done.  Some time was spent on reorganization of the things in the barn.