Key:
1 Deck 11 entrance/exit
2 Jefferies tube access
3 Equipment storage
4 "Pool Table" Master Systems Display
5 Seconday Workstations (4)
6 Chief Engineer's Office
7 Multi-purpose Engineering Lab
8 Duty Engineer's Station
9 Elevator to upper levels
10 M/AM Reactor - Warp core
11 Deck 12 ladder
12 Auxilliary control
13 Micron Core status consoles (2)
14 Dual Micron Core Assembly
15 Impulse engine status
16 Warp drive status |