|
|

Interior & Exterior Painting By ALL WORK
Why should I choose ALL WORK for my Painting needs?
As a team, we have 5 goals to complete in every successful project:
1. In depth project assessment
2. Organized implementation
3. Expert surface preparation
4. Knowledgeable, experienced application
5. Complete final inspection and customer sign off
INTERIOR
Set up
-Moving heavy items - furniture placed in center of each room, covered utilizing new plastic sheeting |
| -Protect wood floors: special protectors are used |
|
| -Protect carpet and vinyl using new drop cloth |
|
-Protect counter tops / cabinetry / railings |
|
Prepare
| |
-Specific to the customers outlined project scope |
| |
-Mold and algae removal |
| |
-Cob web removal |
| |
-Voids, holes, imperfections and cracks will be filled utilizing premium mediums |
Paint
| |
-Pre clean all woodwork utilizing tack cloths |
| |
-Prime any imperfections and new construction |
| |
-Apply quality products for a consistent professional finish |
Cleaning
| |
-Furniture and accessories are replaced to original positions |
| |
-Floors are swept and vacuumed |
| |
-All project tools, equipment, and trash is removed from site |
| |
-Final inspection walk through |
EXTERIOR
Pre-clean surfaces
| |
-Remove dirt, algae and grime by water blasting at low to medium pressure |
| |
-More pressure is applied to large hard to reach areas |
| |
-Hand wash delicate areas |
Surface Prep
| |
-Weather checked paint is scraped and sanded smooth |
| |
-Glossy enamel surfaces shall be scuff sanded |
Caulking
| |
-Quality urethane mediums shall be utilized |
Paint
| |
-Prime repaired areas with oil based products |
| |
-Application of quality paints applied for consistent professional finish |
Clean
| |
-Complete clean up shall be performed, trash removal and sweeping of paint chips |
Inspect
| |
-Complete and finalize project |
| |
-Crew inspection followed by owner inspection and sign off |
2003 LEHIGH STYLE MAGIZINE - 2006 TDEC CERTIFIED
2004 TREX PRO CERTIFIED CONTRACTOR
|