Site hosted by Angelfire.com: Build your free website today!

TheBuild                                                                                                    Regrouping

Many thanks to the enthusiasm of David Spensley, and the hard work of....

Aycl_fab.JPG (19596 bytes)
shell_fr.JPG (23805 bytes)

.....John Flanagan - an artist in metal!

(The shell is nearly complete.  The material which will be
used for the flipper can be seen in place)


shelrear.JPG (18454 bytes)

The rear of the aluminium shell

unpaint_shell.jpg (65886 bytes)

The completed shell, with its stainless steel covering (and Centurion Crest)

paint_flip.jpg (47945 bytes)

....And after Mr Rossi's deft artwork skills - the final paint job!

Painted_left.jpg (69026 bytes)

Maximus...ready to roll....

painted_flip.jpg (66313 bytes)

The drive motors and weaponary can be seen inside.

We receive notification to appear at Elstree studios
on August 24th!
We get ready to go, to face the foes...
but wait!!!!!

Max_shroud.jpg (55834 bytes)

We are let down at the last possible minute when we are kindly informed
that the pneumatic equipment we have been sold will not be able to withstand the
gas pressures that we intend to use.

Pneu_bits.jpg (48643 bytes)

This is despite our specifying the intended pressure from the very start.
Deciding that the equipment is
unsafe for use, we decide not to go
ahead, and postpone the project.

(The fact that the equipment was unsafe was later confimed by an independent company
who were amazed by what had happened)

We fully intend to continue with the project,
using a different supplier and will
spend the next 11 months preparing
for the 2002 local qualifying events.


We wish to extend thanks to all of our sponsors,
and everyone who advised us during the past six months...don't worry...we'll be back!!!


gears2.gif (9258 bytes)

TheBuild                                                                                                    Regrouping