| The
following photos depict the construction process from
start to finish. |
|
Each
panel comes with pre-installed windows, insulation and
exterior sheathing |
|
|
|
|
|
The
crane lifts each panel from the truck and places it
on the prepared decking |
|
|
|
|
|
When
the lower level is complete, second level decking is
put in place |
|
|
|
|
|
The
second level wall system is set in place just as the
first level |
|
|
|
|
|
Interior
and exterior walls are pre-constructed at the factory |
|
|
|
|
|
Trusses
are then lifted and nailed in place. |
|
|
|
|
|
A
typical single story home is secure within 48 hours
which limits damage from rain and theft of materials. |
|
|
|
|
|
A
typical two story home is secure within 72 hours. |
|
|
|
|