Ok, production and engineering from the Dementia demo was completed by May 13th. Final stages of mixdown has already begun. Due to what ever time I can muster on my computer I should have the songs completed shortly.
I am also contemplating about building another computer so that I can wean my computer away from my g/f. I have aquired a Tape Server from work that has a SCSI card installed. My next system architecture will be to utilize the SCSI device to build a RAID5 storage system. hmmmm I could build a Storage Server with a Gigabit ethernet connection....nah the latency will be too slow and be too pricy.