BASIC
HOT AIR FURNACE REPLACEMENT Disconnect and
remove the old heating unit. Supply
and install new heating unit to include putting the new hot air furnace in
place, install transition metal to connect to the existing supply ductwork,
supply or air conditioning coil and install plenum to transition to existing
return ductwork. Connect fuel piping to the new system, wire electric to the
thermostat, wire electric to safety switch. Install smoke pipe to the existing
chimney. Test new installation.
NEW HOT AIR
FURNACE INSTALLATION Supply and
install new heating system to include new hot air furnace, all necessary
supply ductwork and registers, all necessary return ductwork, side filter rack
and return grilles, all necessary fuel piping to the meter or tank, new
thermostat and thermostat wire to connect to the heating unit, new safety
switch and connection to the panel box. Also
includes all necessary venting to the chimney, chimney liner if necessary or
power vent if necessary. Test new
installation. BASIC HOT WATER BOILER
REPLACEMENT Disconnect and
remove the old heating unit. Supply
and install new heating unit to include putting the new hot water boiler in
place, install all necessary pipe and adapters to transition to the existing
radiation supply and return lines. Install
automatic feed on the cold water supply and connect the supply to the boiler.
Install new expansion tank for overflow if necessary.
Connect fuel piping to the new system, wire electric to the thermostat,
wire electric to safety switch. Install smoke pipe to the existing chimney.
Test new installation. NEW HOT WATER
BOILER INSTALLATION Supply and
install new heating system to include new hot water boiler, all necessary
baseboard radiation with supply and return lines, cold water supply line with
automatic feed, all necessary fuel piping to the meter or tank, new thermostat
and thermostat wire to connect to the heating unit, new safety switch and
connection to the panel box. Also
includes all necessary venting to the chimney, chimney liner if necessary or
power vent if necessary. Test new
installation. DOMESTIC GAS HOT WATER
HEATER INSTALLATION Disconnect and
remove the old heating unit. Supply
and install new heating unit to include putting the new hot water heater in
place, install all necessary pipe and adapters to transition to the existing
hot water supply and return lines. Connect the cold water supply line to the
new heater, Install smoke
pipe to the existing chimney. Reconnect fuel line to the gas valve.
Install relief valve and drip tube.
Test new installation DOMESTIC
ELECTRIC HOT WATER HEATER INSTALLATION Disconnect and
remove the old heating unit. Supply
and install new heating unit to include putting the new hot water heater in
place, install all necessary pipe and adapters to transition to the existing hot
water supply and return lines. Connect the cold water supply line to the new
heater. Make all electrical
connections. Install relief valve
and drip tube. Test new
installation CENTRAL AIR
CONDITIONING INSTALLATION
|
|
Send mail to robert.mcginnis6@verizon.net with