Values

Basic Fundamental to achieve our mission  :

PEOPLE. Our people, working together, are the best source of our strength. Their knowledge, ingenuity, resourcefulness, and honesty are the windows through which we are judged.

SERVICES. Our services are the results of our efforts. Their quality, reliability and overall cost effectiveness establish our worth to our customers.

PROFITS. Profits are measurable of how efficiently we provide our customers with the best services for their needs. Profits are essential for growth and prosperity.

l     
 
l
l

Guiding Principles

CUSTOMERS' satisfaction is our  focus. All our works must be done with the satisfaction of our customers in mind. We must understand and fulfill their current and future needs.
 
CONTINUOUS IMPROVEMENT is essential to our success. We will provide an environment that encourages employee participation, which is essential to the improvement process.
 
We need to establish LONG TERM RELATIONSHIPS with customers, team members and partners based on loyalty, trust and integrity.
 
We will continue to conduct our business according to the highest ETHICAL STANDARDS both as individuals and as a corporation.      

 

Scope of Services

The M&E Services provide by EMZEX Consulting Engineers are: -

Mechanical

Air Conditioning and Ventilation System, Fire Protection System, Plumbing System (Cold Water & Sanitary Services), Gas Pipe Line System, Gas Welding System, Kitchen Equipment, Fume Cupboard & Lab Equipment, Refused Compactor & Incinerator System, Gondola System, Dust Extractor System and Swimming Pool System. 

 Electrical

Electrical HV & LV System (Internal System), Electrical HT & LV Infrastructure Reticulation (External System), Generator Set System, Audio Visual System, Stage Lighting System, Street Lighting & Compound Lighting System, Lightning Protection System, Telephone & PABX System (Internal System), Telecommunication Infrastructure Work (External System), Building Automation System, Electrical Supervision.

Development of EMZEX

Management’s Role in Good Consultancy Practices

Direct responsibility for the design and implementation of a

M&E consultancy quality assurance programme.

*Formalize objectives and briefing that specify the accuracy of work required, selection of    methods, and work handling procedures.

*Select appropriate personnel to perform design functions

*Provide facilities and equipment necessary for the performance of design function

*Establish monitoring methods and record keeping protocols to verify the accuracy and consistency of the design work.

*Establish procedures for the initiation of corrective  measures when unacceptable design is discovered.

Principal of Electrical

Name : Ir Mastura Haji Zakaria

Y.O.B : 1971

Qualification : B. Eng (Elect) Hons, UTM. MIEM. P.ENG

Professional Experiences

EMZEX Consulting Engineers (October 2002 - Present)

JZA Jurutera Perunding (Jan 1998 - October 2002)

Perunding LNR (1997 - 1998)

Ranhill bersekutu (1995 - 1997)

Principal of Mechanical

Name : Ir. Mohd Khalid Hassan

Y.O.B : 1954

Qualification : M Sc. eng (Birmingham), B Sc. (Hons), in

 Mechanical Engineering (CNAA,UK) MIEM, P.ENG

Professional Experiences

EMZEX  Consulting Engineers (October 2002 - present)

JZA Jurutera Perunding (Jan 1999 - October 2002)

Universiti Teknologi MARA (Oct 1984 - Dec 1998)

Malaysian Airline System (1997 - 1984)

 

 

Scale of Fees

 

 

Cost of Class of Works

Fee for class I works

Fee for class II works

Fee for class III works

On the first RM On the next RM On the next RM

On the next RM On the next RM

On the next RM On the next RM

On the next RM On the next RM On the next RM

On the remainder

 

50,000
75,000
125,000
250,000
500,000
1,500,000
2,500,000
5,000,000
10,000,000
20,000,000

11.00%

9.00%

7.50%

6.50%

6.00%

5.50%

5.00%

4.50%

4.25%

4.00%

3.75%

9.00%

7.50%

6.75%

6.25%

5.75%

5.25%

4.75%

4.25%

3.75%

3.50%

3.50%

7.00%

6.25%

5.75%

5.25%

4.75%

4.25%

3.75%

3.50%

3.25%

3.00%

3.00%

 

Mode of Payment

       Project Progress                                                    % of Payment

          Preliminary Stage                                                                            20%

          Design Stage (A)                                                                           45%

          Design Stage (B)                                                                            15%

          Tender Stage                                                                                  5%

          Construction Stage                                                                        15%