Site hosted by Angelfire.com: Build your free website today!


Deck was ripped up due to balsa being wet then the Idea of a removable fishbox came along (like I didn't have Enough Work).

3/4" balsa was glued down with Epoxy, top was finished with Polyester.

Removable fishbox in construction.

Box mold with the box ready for trimming and removal.

Hatches are being trimmed in the mold."

Gutter mold after gutter was removed.

Gutter ready for Installation.

Box in place.

Box out and look at the great axcess to the bilge.

Box in use and the Date really was 9-8-2002.

Thanks to Keith at Kep-Per Enterprises for use of his shop to build the molds and pieces.

This page is maintained by Dan Sullivan

Last updated 12-10-2003