Getting The Cabin Walls Painted
In December 2010 I completed painting the guest bedroom and its closet, the alcoves (the cabin's
front sitting room areas), the alcove closet, and the great room walls (except for the upper portions
that I could not reach with the ladder I was using).
X X X X X X X X X X X X X X X X X X X X X X
On This trip I painted the master bathroom, the master bedroom and closet, the guest bathroom,
and the pantry closet. Before I could start slapping paint on drywall, though, there were about three
days worth of spackling, sanding and caulking that had to be completed.
X X X X X X X X X X XXX
Master Bath
Master Bedroom
Guest Bathroom
Main Menu