Site hosted by Angelfire.com: Build your free website today!

Minutes of the 5th Meeting

Date : 7 March 2001
Time : 9.00am
Venue : Design Automation Laboratory


Present Absent
Bian Hao Hao Chen Zhiqiang
Lu Fang  
Zhang Xiandong  
Chin Seam Chern
Chong Quee Jen
 
Loo Hui Tze  
Lim Ting Min  

 

1 Updates from all members.
1.1

From Analyst:
Finished use case diagrams and class diagrams. Will be doing the possible cases of input and output.

1.2

From Designer:
Finished design (1st and 2nd draft). Will be completing pseudo code.

1.3 From Programmer:
Use Java applet and SQL for the timetable. Just select from cobol box, then data taken directly from database (for retrieving the timetable).
   
2 Things to be done and produced on Friday (9/3/2001).
2.1 From Jiancheng:
3 pictures for design, use case diagrams and class diagrams (in .jpg or .gif). List the possible cases for input and output.
2.2 HaoHao will be writing the pseudo code for the sorting. Huizhi will be writing the pseudo code for the get/read. LuFang will be writing the pseudo code for the display.
2.3 Programmers are to write a simple code that can run and produce some output.
   
Thank You for your hard work... Ganbatte!

 

Next meeting to be scheduled at 9 March, 4.30pm outside LT1.