Minutes of the 2nd Meeting

Date : 9 February 2001
Time : 5.00pm
Venue : Canteen A


Present Absent with Apologies
Bian Hao Hao Chen Zhiqiang
Lu Fang  
Zhang Xiandong  
Chin Seam Chern  
Chong Quee Jen
 
Loo Hui Tze  
Lim Ting Min  

 

1 Changed in team structure.
1.1 3 programmers, 2 analysts, 2 designer and 1 tester/documenter.
1.2 Lu Fang changed to designer.
1.3 Jane changed to programmer.
1.4 Tingmin will be the tester and documenter.
2 Work to be done in this sequence.
2.1 Analysts will do the planning and risk analysis first (Use Cases and Object Diagrams).
2.2 Programmers will then translate intp programming language.
2.3 The tester will do the testing at the end.
2.4 Analysts (Zhiqiang and JianCheng) are suppose to do a planning by Tuesday before discussions.
2.5 Everyone is to get familiarize with the tools used (Java and Rational Rose) during free access.
3 Discussion of the project (Schedule Planner)
3.1 Since customer never give much information, we have to come up with a product first and allow the customer to see if they need to add anything.
3.2 The Schedule Planner allows user to block certain periods.
3.3 Then check if the lecture time for the selected subjects is within what they had blocked.
3.4 Show a message informing about the clash.
3.5 Timetable can be displayed:
1.Generate all possible combinations of timetable and displayed on screen. But the number of combinations might be a lot.
2.Generate all possible combinations of timetable then display the NUMBER of combinations. User allowed to view timetable one by one. But the code would be difficult to write.
4 Designer have to go back and write a basic program after the analysts had finished:
4.1 Check if all the scenarios had been covered.
4.2 Check the number of combinations.
4.3 Show the number of timetables generated.
4.4 Display the index number after specific timetable had been selected.

 

Next meeting to be scheduled at 13 February, 4.30pm outside LT1.