A good view of the bees.
09/29/00
The sign has been added!
09/11/00
The orange from far off.
A close view. Notice the bees that have been added.
They're still working on a few things. Good close up of the bees too.
06/02/00
It looks like they are installing permanent lighting.
05/24/00
All the bees are unwrapped now and it's easy to get a good view.
05/08/00
They've painted a few bees on the part that spins in the middle.
05/03/00
A leaf has been added.
Here's a full view of the orange.
Here's a full view of it testing!
Here's a close-up of the bees flying around.
03/28/00
Here's a view of the nearly completed orage.
Bees! 48 in all!
Here's where the bees are hung.
03/12/00
More peel and more detail!
The swing set! What a cool touch! Time for bees!
03/09/00
Look! About half the peel's done.
The actual swing set is going up!
The railings are up now too!
02/26/00
More peel!
02/05/00
On the other side the peel continues upwards.
01/28/00
Here's a full view.
The peel is finally being put on!
The elevator is done. It looks pretty sharp too the way they painted it.
01/02/00
The peel has started!.
The peel can be seen along the bottom.
12/02/99
This close-up of the peel looks like an actual orange peel with all the holes in it.
11/28/99
They've recently added this black floor to the base. Are they getting ready to work on it again?
10/28/99
The elevator. 10/17/99
Framing for the peel has started!
09/07/99
WOW! A piece of Orange Peel was added!
08/26/99
What's the wooden box for? Can anyone tell me?
The station.
07/28/99
This is where the motors for Orange Stinger are going.
07/05/99
This shows the complete framework for Orange Stinger as well as the green bar which will support the swings. This also let's you see that they are probobly installing the motors beneath it.