A few cutout palms in the building front mural.
The steeple lit at night.
09/11/00
The back of the mural that covers the building's front.
04/06/00
Here's the entrance to Superstar Limo.
03/28/00
It now has the top border painted dark brown.
10/17/99
The paint job is about done.
Looks finished, doesn't it?
10/10/99
The paint job is about half done.
09/24/99
This is the front of Superstar Limo.
The final colors are already being added.
The primer is going on the bottom part.
09/18/99
This is the architechturally complete Superstar Limo building.
This shows construction workers working on a Saturday on the side of SuperStar Limo.
This is a good close-up of the top rim of the limo building.
Don't you just wish they'de leave the door open!
09/07/99
Notice the top is paved and the sides are getting insulated.
If you look, you can see part of the ventillation has been installed.
08/22/99
There are now metal walls on the inside which I assume are getting ready for cement.
This is a new top piece added on. It's probobly for a better architectural look.
08/04/99
As you can see, metal walls are going up.
07/22/99
The building is now covered in tarp.
This is a worker fireproofing the steel of Superstar Limo.
7/22/99
This picture is of the newly paved floor.
7/14/99
Here you can see where the footers have been placed for indoor walls.
07/11/99
This was the first steel structure to rise in DCA.
This is the pre-show to one of the two attractions.