DCA Construction Pictures: Jumpin' Jellyfish

Last Updated: 10/15/00

A couple views of the cue.

A look at the area around the ride.

10/07/00

The chutes have now been uncovered.

Here's a closer view. Note the people washing and sweeping the walkways. This is a sign that the area is now free of construction.

09/29/00

The chutes for Jumpin Jellyfish.

9/11/00

Jumpin' Jellyfish in action with all the chutes.

07/28/00

The towers are done and ride vehicles are attached. All that needs to be added are the actual parachutes.

06/02/00

They're paving the base.

05/03/00

I think this might be the entrance.

Here's a close up of some of the detail.

Here's a full view of the two towers.

02/26/00

Some of the foundation is done.

02/21/00

The foundations are being poured now. I'm glad to see this one going up.