July 5-10, 1999

Perry, Keith and John set up the scaffolding and plank.

John rigs up a support system and the first sets of rafters are in place.

A shot from the inside of the first section looks like a real roof frame.

It was slow going in the heat as John worked alone. Once Perry was there to help, the progress was swift.

 

 Framing in the gable ends gives the barn more shape.

The inside ceiling is strengthened by support struts, so that it can have a wide open space on the barn floor.

It was cooler today, but too windy to do sheathing.

Rain Day July 10,1999
Time to Plan