
The "hot" end of the chamber. The brass fitting is fitted with a piece of copper pipe which will accept a high-temp neoprene hose to connect it to the Mixer. The plasma plug is mounted into a bung on the side, and the tip is made to touch the side of the rod. The whole unit MUST be tested for air leakage for at least ten minutes to make sure everything is sealed properly.