All my tasks have been completed in a timely manner. Task 1. Test corporate web site in daily bases to make sure LAN system working in a prefect condition, make sure inquiries coming through worldwide. Programming languages are being used. Task 2. Translate inquiries in different languages (including French, Spanish, Simplified and Traditional Chinese, Portuguese, Russian, Thai, Korean) into English. Task 3. Coordinate with sales department, material department and production management team to prepare quotation and help foster orders processing. Task 4. After inquiries come in, discuss with VP Engineer and operation manager to finish design draft. Then gather data and finished parts design (capacitor can drawing and top drawing) by using AUTOCAD, LOTUS NOTES, VISTA and some other relevant software tools in a professional level. Task 5. Create MA (master assembly) upon parts drawing and operation manager's approval Task 6. Update MA data cross reference database and post it through intranet for material department, sales department & production department reference. Task 7. Update parts drawing data on the worldwide web site. Task 8. Update web posting in weekly bases. Task 9. Handling phone calls for products and services online posting. Task 10. Manage wirewound control finished products and parts drawing database (covering the last 20 years sold products). Larry L. Wang Marketing & Engineering Dept. Mallory-DuraCap International Inc. 59 Montclair Drive, Woodstock Ontario N4S 7W8 Canada GO TO HOME PAGE->http://www.angelfire.com/electronic2/lwang2/index.html