CUSTOMER APPLICATION CONTROL SYSTEMS YEAR
--------------------- -------------------------- --------------- -----------
National Power Corp Manila 1 Utility Boiler Pneumatic 1965
National Power Corp Manila 2 Utility Boiler Pneumatic 1966
National Power Corp Manila 2 Utility Boiler Pneumatic 1984
National Power Corp Manila 2 Utility Boiler DCS 1983
National Power Corp Manila 1 Utility Boiler DCS 1986
National Power Corp Sucat 1 Utility Boiler DCS 1987
Goodyear Philippines Utility Boiler CLC 1987
National Power Corp Sucat 4 Utility Boiler DCS 1988
Paper Industries of the Phils. Utility Boiler CLC 1989
National Power Corp Malaya Complex Training DCS 1990
System
NPC / Hopewell Navotas 200MW GT Eng’g & Design 1990
National Power Corp Utility Boiler DCS 1990
National Power Corp Sucat 3 Utility Boiler DCS 1991
National Power Corp Sucat 2 Utility Boiler DCS 1992
Union Ajinomoto Pasig Pneumatic 1992
Solid Cement Corp Line 3 Finish Mill DCS 1992
First Private Power Corp 22x11.5MW Diesel Plant DCS 1993
First Philippine Industrial (2)-120 Km Pipeline SCADA 1997
Corp.
Among their most recent relevant similar projects are presented below:
National Power Corporation - Supply, installation, test and commissioning of
Mini-Line 500 Pneumatic Control System for Manila
Thermal Plants 1 and 2 Utility Boilers;
- System check-out, test and commissioning of
Malaya Thermal Plant 2 Infi-90 Unit Master &
Turbine Control Modification and Rehabilitation of
Mini-Line 500 which will put the system fully
automatic.
- Supply, installation, test and commissioning of
Network-90 Distributed Control System for Malaya
Thermal Plants 1 Utility Boiler.
- Supply, installation, test and commissioning of
Network-90 Distributed Control System for
Sucat 1, 2, 3 and 4 Utility Boilers;
- Supply, installation, test and commissioning of
Network-90 Distributed Control System for Malaya
Complex Training System.
Paper Ind. of the Philippines - Supply, installation, test and commissioning of
Command Series Controller for Utility Boiler.
National Steel Corporation - Supply, installation, test and commissioning of
N-90 Distributed Control System for Utility Boiler.
Union Ajinomoto - Supply, installation, test and commissioning of
Mini-Line 500 Pneumatic Control System for steam
plant.
Solid Cement Corporation - Supply, installation, test and commissioning of
Infi-90 for Finish Mill No. 3.
First Private Power Corporation - Supply, installation, test and commissioning of
Infi-90 for the Bauang 22x11.5MW Diesel Power
Plant in Bo. Payocpoc, Bauang, La Union.
Ishikawajima-Harima - Installation and commissioning of complete fully
automatic Boiler Controls and Instrumentation
Systems for 3x150MW Power Plant in Bangladesh.
Goodyear Tire & Rubber Company - Supply, installation, test and commissioning for
upgrading of furnace draft controls.
UTILITY OPERATION & MAINTENANCE
Saudi Consolidated Electric Co. - Operation & maintenance of Company ASIR
Saudi Arabia Region Utility System, Saudi Arabia
Kingdom of Saudi Arabia, comprising of
7x60MW Gas Turbine and 9x10MW Diesel
Power Plants, 132/33/138KV Transmission
Lines 130MVA 132/33/138 KV Substation
and 13.8/0.44/0.22KV. Distribution Lines,
Scope of Work including utility engineering
and system studies, emergency repairs and
patrol, equipment overhauling, repairs and
maintenance,SCADA operations and load
dispatching.
Hopewell Power (China) Ltd. - Operation & maintenance of the
Shajiao B, China 2x350MW Coal-fired Power Plant.
BOILER/TURBINE INSTALLATION & COMMISSIONING WORKS
Ishikajima-Harima Heavy Industries - Installation and commissioning of Foster
Bangladesh Wheeler type, dual fired (natural gas
and oil) 3x150MW Boiler Systems complete
with all auxiliaries, such as fuel
forwarding, water treatment, electrical
drives, automatic control systems.
Toshiba Electric - Installation and commissioning of a
Shajiao B, China reaction type 2x350MW steam urbine
complete with all auxiliaries and controls.
- Complete boiler retubing for a 100,000 lbs.
per hour Bagasse-Fired Boiler.
Paniqui Sugar Mill Corporation - Conversion of same 100,000 lbs./hr. boiler
Paniqui, Tarlac from Bagasse-Fired to Dual, Oil and
Bagasse-Fired Boiler.
ELECTRICAL WORKS
C.I.G.I. - Complete engineering supply,installation
Santa Rosa, Laguna and commissioning of a 10MVA 115KV-416KV
Power Station complete with 5KV and 60V
distribution network.
Asia Brewery - Engineering supply, installation &
Cabuyao, Laguna commissioning of a 25MVA/115KV 34.5KV
Power Station.
North Davao Mining Corporation - Engineering supply, installation and
(Amacan, North Davao) commissioning of 20MVA/138KV-13.8KV
Power Station.
Dynetics, Inc. - Engineering supply, installation and
(FTI Complex) commissioning of 7.5MVA, 34.5KV-480 Volts
Power Station.
Benguet Corporation - Engineering supply, installation and
(Zambales) commissioning of 10MVA, 69KV-416KV Power
Station.
Pacific Cement Company - Engineering supply, installation and
Surigao City commissioning of 6.0MVA, 69KV-33KV Power
Station.
Mindanao Plywood - Engineering supply, installation and
Zamboanga City commissioning of 1,500KVA, 13.8KV 480
Volts Power Center.
Surigao Consolidated Mining - Engineering supply, installation and
Surigao City commissioning of 1,500KVA, 13.8KV 480
Volts Power Center.
Standard Plywood Corporation - Engineering supply, installation and
Zamboanga City commissioning of 1000KVA, 13.8KV, 480
Volts Power Center.
Interco-Zamboanga - Engineering supply, installation and
commissioning of 3000KVA, 13.8KV, 480
Volts Power Center.
Southern Islands Oil Mills - Engineering supply, installation and
Roxas, Zamboanga commissioning of 2000KVA, 69KV, 480
Volts Power Center.
Cebu Port Complex - Engineering supply, installation and
commissioning of 2x5000KVA and 2500KVA,
13.8KV, 480 Volts Power Stations with
complete distribution network at 5KV and
600 Volts levels.
Paniqui Sugar Mill Corporation - Complete rehabilitation of switchgear and
controls,comprising of supply, installation
and commissioning of 480 Volts 2000A power
switchgear.
Consolidated Industrial Gases, Inc. - Complete engineering supply, installation
and commissioning of a 15MVA, 69KV, 4.16KV
Power Station complete with 5KV and 600V
distribution network.
STUDIES, REPORTS/DESIGN & ENGINEERING
Saudi Consolidated Electric Co. - System engineering of SCECO’s 132KV
Abha, Saudi Arabia Transmission Line System Expansion
Project including surveying and design.
- Systems Planning of SCECO’s 23KV and 13.8KV
Distribution System extensions and new
electrification projects.
- Special engineering studies, i.e. System
Load Flow, Fault Study Fuel Management/
Optimization, Incinerator Pollution Control
and Stocks Inventory Control.
Mitsubishi Heavy Industries - Detailed engineering, material take-off and
(1987) estimates for a US$42 Million Petro-chemical
Complex tender requirements comprising:
1. Mechanical Works for Process Expansion
2. Instrumentation & Control Upgrading
3. Energy Management System
4. Electrical Power System Upgrades
5. New Process Equipment for the Naphtha
Cracking System
Bailey Controls Company, USA - Detailed engineering, material take-off and
(1987) estimates for a US$42 Million Petro-chemical
Complex tender requirements comprising
instrumentation and control upgrading.
San Miguel Corporation - Feasibility studies on co-generation system
for the following SMC Plants:
1. SMC Beer Brewery, La Tondena and Metal
Closure and Lithography Plant-12,000KW;
2. Magnolia Poultry Processing Plant
-12,000KW.
Silahis International Hotel - Feasibility studies on co-generation
requirements for hotel operation requiring
5MW diesel plant and 100 tons/day of hot water
requirement.
Ramie Textiles, Inc. - Complete feasibility study on design and
engineering of a 5MW Power Plant with fuel
co-generation features resulting in the decision
of Ramitex to tender the project.
Hopewell Holdings Ltd. - Complete conceptualization, design development
Hongkong (1987-1989) and engineering of a 200MW gas turbine power
plant inclusive of civil works details, plant
operation philosophy and electro-mechanical
protection systems. Scope includes full design
and engineering of a 115KV, 600MW capacity
breaker and 1/2 outdoor type switchyard.
Consolidated Industrial Gases, Inc. - Complete conceptualization, design development
Apalit, Pampanga (1988-1989) and engineering of a 15MVA, 69KV-4.16KV-480V-
220V power system network, comprised by an
outdoor substation, 5KV switchgear, and motor
control center, 480V motor control center, and
switchgears, 240V switchboards, and distribution
brands, complete with interconnecting power
cables and termination systems, centralized
control and alarm panels and AC/DC auxiliary
control systems.
200MW GAS TURBINE DESIGN & ENGINEERING PROJECT
In cooperation with Ewbank Preece Engineering (Far East) Ltd., a member of the Ewbank Preece Group, one of the biggest firms of Consulting Engineers in the United Kingdom, FPEC developed the concepts of a 200MW Gas Turbine Power Plant on a BOT scheme.
The conceptual development of the 200MW Gas Turbine Power Plant involved:
- Soil consolidation requirements
- Site development
- Plant equipment layout
- Plant drainage and flood control
- Gas turbine equipment and system packaging
- Fuel forwarding and storage system
- Plant fire alarm and protection system
- Plant clean/sewerage/waste water system
- Plant grounding system
- Plant lighting system
- Plant communication system
- Control and maintenance blocks
- 115KV switchgear system configuration
- Plant system control and protection philosophy
- Black-start system
The complete detailed and design and engineering scope involved:
- Fuel forwarding and storage system
- Plant fire alarm and protection system
- Plant clean water system
- Plant grounding system
- Plant lighting and auxiliary power system
- Plant communication system
- 115KV switchyard system
- 115KV switchyard control and protection philosophy
- Building auxiliaries, such as air conditioning clean/waste water, fire alarm/protection systems
- Infacing between plant system and utility grid
RENEWABLE ENERGY SYSTEMS PROJECTS (SOLAR AND SOLAR DIESEL HYBRID/WIND TURBINE GENERATORS)
LOCATION CLIENT APPLICATION
---------------------- --------------------------------- ------------------------------
Pampanga Phivolcs Telemetry (Lahar)
Marinduque Phivolcs Telemetry (Earthquake)
Mindoro Phivolcs Telemetry (Earthquake)
Ambuklao Napocor Telemetry (Hydro)
Ambuklao Napocor Telecom
El Nido, Palawan Piltel Telecom, 120W
Hill 354, Palawan Piltel Telecom, 120W
Mt. Oltaloro, Palawan Piltel Telecom, 120W
Mt. Java, Quezon RCPI Telecom, 1600W
Catbalogan, Samar RCPI Telecom, 1600W
Canini, Samar RCPI Telecom, 1600W
Verde Is. Batangas VISPA 20 Solar Home System
Zambales, Surigao NEA-SEP 300 Solar Home System
Abra ABRECO 113 SHS
Panatoan, Benguet RCPI Telecom, 1600W
Maasin, Leyte RCPI Telecom, 1600W
Pintuyan, Leyte RCPI Telecom, 1600W
Bohol NCED-DOE Water Pumping, 7000 GPD
Masbate NCED-DOE Water Pumping, 7000 GPD
Davao del Sur NCED-DOE WaterPumping, 7000 GPD
Cebu NCED-DOE Water Pumping, 7000 GPD
Lanao del Sur NCED-DOE Water Pumping, 7000 GPD
Impas-ong N. Samar NCED-DOE Water Pumping, 5000 GPD
Catarman, N. Samar NCED-DOE Water Pumping, 5000 GPD
Muñoz, N. Ecija NCED-DOE Water Pumping, 5000 GPD
Echague, Isabela NCED-DOE Water Pumping, 5000 GPD
Misamis Oriental NCED-DOE Water Pumping, 5000 GPD
Lacub, Abra NCED-DOE Battery Charging, 616Wp
Dauin, Negros Or. NCED-DOE Battery Charging, 616Wp
Basco, Batanes NCED-DOE Battery Charging, 616Wp
Trinidad, Bohol NCED-DOE Battery Charging, 616Wp
Minasag, Cam Norte DIGITEL Telecom, 1852W
Cavite ANEC-DOE SHS Demo Unit
Bacolod Kinetic Feeding System 21 Fish Feeding Equipment
Basco, Batanes NCED-DOE 600W Wind Turbine
Laguna NCED-DOE 600W Wind Turbine
Antipolo/Tarlac Multilink Communication Telecom
Romblon Romblon Electric Coop 25 Solar Home Systems
Tineg, Abra Abra Electric Coop 300 Solar Home Systems
Palawan State Polytechnic College SHS, Streetlight, Battery
of Palawan Charging
Leyte Eastern Visayas Tel. Co. Telecom, 1600W