Missing
Infrastructure
(Sidewalks,
Curbs, Gutters, Ped Ramps, Cross Gutters)
•Missing Sidewalk: 162,000 lineal feet
• ($24 million)
•Missing
Sidewalks, Curbs and Gutters: 148,000 lineal feet
• ($107 million)
•Missing Ped Ramps: 1,223 missing
ramps
• ($8.0 million)
•GIS Map for more detail
•
Total Estimated Funding Gap = $139 million
•Problematic Cross Gutters: 87 to date
• ($10,000 to $100,000 each)
•Infrastructure Workshop #2