CHULA VISTA BAYFRONT MASTER PLAN
ENVIRONMENTAL IMPACT REPORT
•Draft EIR (September 2006)
-58 comment letters; over 1200 individual comments
-Not enough detail in DEIR
•Revised Draft EIR (2008)
-Includes specific project descriptions
The new EIR expected out by Spring of 2008 will include project level analysis of the Signature Park, Gaylord, and Residential.