The Citizens
Advisory Committee divided the area into 3 districts to aid in their
discussions. This option with the signature park in the Sweetwater District
came into favor because Gaylord wanted most of the land in the Harbor Park
option. The three districts consist of: 129 acre Sweetwater (adjacent to the
Sweetwater National Wildlife Refuge), which was planned as low intensity, 280
acre Harbor (where marina now is), which was planned with the highest
intensity, and 153 ac Otay(where the power plant now is), which was planned
with medium intensity.
|