PART 771--ENVIRONMENTAL IMPACT AND RELATED PROCEDURES

Sec.
771.101 Purpose.
771.103 [Reserved]
771.105 Policy.
771.107 Definitions.
771.109 Applicability and responsibilities.
771.111 Early coordination, public involvement, and project development.
771.113 Timing of Administration activities.
771.115 Classes of actions.
771.117 Categorical exclusions.
771.119 Environmental assessments.
771.121 Findings of no significant impact.
771.123 Draft environmental impact statements.
771.125 Final environmental impact statements.
771.127 Record of decision.
771.129 Re-evaluations.
771.130 Supplemental environmental impact statements.
771.131 Emergency action procedures.
771.133 Compliance with other requirements.
771.137 International actions.

    Authority: 42 U.S.C. 4321 et seq.; 23 U.S.C. 109, 110, 128, 138 and 315; 49 U.S.C. 303(c), 5301(e), 5323, and 5324; 40 CFR part 1500 et seq.; 49 CFR 1.48(b) and 1.51.

    Source: 52 FR 32660, Aug. 28, 1987, unless otherwise noted.

Sec. 771.101 Purpose.

    This regulation prescribes the policies and procedures of the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) for implementing the National Environmental Policy Act of 1969 as amended (NEPA), and the regulation of the Council on Environmental Quality (CEQ), 40 CFR parts 1500 through 1508. This regulation sets forth all FHWA, FTA, and Department of Transportation (DOT) requirements under NEPA for the processing of highway and mass transportation projects. This regulation also sets forth procedures to comply with 23 U.S.C. 109(h), 128, 138, and 49 U.S.C. 303, 5301(e), 5323(b), and 5324(b).

[52 FR 32660, Aug. 28, 1987, as amended at 70 FR 24469, May 9, 2005]

Sec. 771.103 [Reserved]

Sec. 771.105 Policy.

    It is the policy of the Administration that:
    (a) To the fullest extent possible, all environmental investigations, reviews, and consultations be coordinated as a single process, and compliance with all applicable environmental requirements be reflected in the environmental document required by this regulation. [NOTE 1: FHWA and FTA have supplementary guidance on the format and content of NEPA documents for their programs. This includes a list of various environmental laws, regulations, and Executive orders which may be applicable to projects. The FHWA Technical Advisory T6640.8A, October 30, 1987, and the FTA supplementary guidance are available from the respective FHWA and FTA headquarters and field offices as prescribed in 49 CFR part 7.]
    (b) Alternative courses of action be evaluated and decisions be made in the best overall public interest based upon a balanced consideration of the need for safe and efficient transportation; of the social, economic, and environmental impacts of the proposed transportation improvement; and of national, State, and local environmental protection goals.
    (c) Public involvement and a systematic interdisciplinary approach be essential parts of the development process for proposed actions.
    (d) Measures necessary to mitigate adverse impacts be incorporated into the action. Measures necessary to mitigate adverse impacts are eligible for Federal funding when the Administration determines that:
    (1) The impacts for which the mitigation is proposed actually result from the Administration action; and
    (2) The proposed mitigation represents a reasonable public expenditure after considering the impacts of the action and the benefits of the proposed mitigation measures. In making this determination, the Administration will consider, among other factors, the extent to which the proposed measures would assist in complying with a Federal statute, Executive Order, or Administration regulation or policy.
    (e) Costs incurred by the applicant for the preparation of environmental documents requested by the Administration be eligible for Federal assistance.
    (f) No person, because of handicap, age, race, color, sex, or national origin, be excluded from participating in, or denied benefits of, or be subject to discrimination under any Administration program or procedural activity required by or developed pursuant to this regulation.

[52 FR 32660, Aug. 28, 1987; 53 FR 11065, Apr. 5, 1988, as amended at 70 FR 24469, May 9, 2005]

Sec. 771.107 Definitions.

    The definitions contained in the CEQ regulation and in Titles 23 and 49 of the United States Code are applicable. In addition, the following definitions apply.
    (a) Environmental studies. The investigations of potential environmental impacts to determine the environmental process to be followed and to assist in the preparation of the environmental document.
    (b) Action. A highway or transit project proposed for FHWA or FTA funding. It also includes activities such as joint and multiple use permits, changes in access control, etc., which may or may not involve a commitment of Federal funds.
    (c) Administration action. The approval by FHWA or FTA of the applicant's request for Federal funds for construction. It also includes approval of activities such as joint and multiple use permits, changes in access control, etc., which may or may not involve a commitment of Federal funds.
    (d) Administration. FHWA or FTA, whichever is the designated lead agency for the proposed action.
    (e) Section 4(f). Refers to 49 U.S.C. 303 and 23 U.S.C. 138. [NOTE 2: Section 4(f), which protected certain public lands and all historic sites, technically was repealed in 1983 when it was codified, without substantive change, as 49 U.S.C. 303. This regulation continues to refer to section 4(f) because it would create needless confusion to do otherwise; the policies section 4(f) engendered are widely referred to as “section 4(f)” matters. A provision with the same meaning is found at 23 U.S.C. 138 and applies only to FHWA actions.]

[52 FR 32660, Aug. 28, 1987, as amended at 70 FR 24469, May 9, 2005]

Sec. 771.109 Applicability and responsibilities.

    (a)(1) The provisions of this regulation and the CEQ regulation apply to actions where the Administration exercises sufficient control to condition the permit or project approval. Actions taken by the applicant which do not require Federal approvals, such as preparation of a regional transportation plan are not subject to this regulation.
    (2) This regulation does not apply to, or alter approvals by the Administration made prior to the effective date of this regulation.
    (3) Environmental documents accepted or prepared by the Administration after the effective date of this regulation shall be developed in accordance with this regulation.
    (b) It shall be the responsibility of the applicant, in cooperation with the Administration to implement those mitigation measures stated as commitments in the environmental documents prepared pursuant to this regulation. The FHWA will assure that this is accomplished as a part of its program management responsibilities that include reviews of designs, plans, specifications, and estimates (PS&E), and construction inspections. The FTA will assure implementation of committed mitigation measures through incorporation by reference in the grant agreement, followed by reviews of designs and contruction inspections.
    (c) The Administration, in cooperation with the applicant, has the responsibility to manage the preparation of the appropriate environmental document. The role of the applicant will be determined by the Administration accordance with the CEQ regulation:
    (1) Statewide agency. If the applicant is a public agency that has statewide jurisdiction (for example, a State highway agency or a State department of transportation) or is a local unit of government acting through a statewide agency, and meets the requirements of section 102(2)(D) of NEPA, the applicant may prepare the environmental impact statement (EIS) and other environmental documents with the Administration furnishing guidance, participating in the preparation, and independently evaluating the document. All FHWA applicants qualify under this paragraph.
    (2) Joint lead agency. If the applicant is a public agency and is subject to State or local requirements comparable to NEPA, then the Administration and the applicant may prepare the EIS and other environmental documents as joint lead agencies. The applicant shall initially develop substantive portions of the environmental document, although the Administration will be responsible for its scope and content.
    (3) Cooperating agency. Local public agenices with special expertise in the proposed action may be cooperating agencies in the preparation of an environmental document. An applicant for capital assistance under the Federal transit laws (49 U.S.C. Chapter 53) is presumed to be a cooperating agency if the conditions in paragraph (c) (1) or (2) of this section do not apply. During the environmental process, the Administration will determine the scope and content of the environmental document and will direct the applicant, acting as a cooperating agency, to develop information and prepare those portions of the document concerning which it has special expertise.
    (4) Other. In all other cases, the role of the applicant is limited to providing environmental studies and commenting on environmental documents. All private institutions or firms are limited to this role.
    (d) When entering into Federal-aid project agreements pursuant to 23 U.S.C. 110, it shall be the responsibility of the State highway agency to ensure that the project is constructed in accordance with and incorporates all committed environmental impact mitigation measures listed in approved environmental documents unless the State requests and receives written Federal Highway Administration approval to modify or delete such mitigation features.

[52 FR 32660, Aug. 28, 1987; 53 FR 11065, Apr. 5, 1988, as amended at 62 FR 6873, Feb. 14, 1997; 70 FR 24469, May 9, 2005]

Sec. 771.111 Early coordination, public involvement, and project development.

    (a) Early coordination with appropriate agencies and the public aids in determining the type of environmental document an action requires, the scope of the document, the level of analysis, and related environmental requirements. This involves the exchange of information from the inception of a proposal for action to preparation of the environmental document. Applicants intending to apply for funds should notify the Administration at the time that a project concept is identified. When requested, the Administration will advise the applicant, insofar as possible, of the probable class of action and related environmental laws and requirements and of the need for specific studies and findings which would normally be developed concurrently with the environmental document.
    (b) The Administration will identify the probable class of action as soon as sufficient information is available to identify the probable impacts of the action. This is normally no later than the review of the transportation improvement program (TIP) .
    (c) When FHWA and FTA are involved in the development of joint projects, or when FHWA or FTA acts as a joint lead agency with another Federal agency, a mutually acceptable process will be established on a case-by-case basis.
    (d) During the early coordination process, the Administration, in cooperation with the applicant, may request other agencies having special interest or expertise to become cooperating agencies. Agencies with jurisdiction by law must be requested to become cooperating agencies.
    (e) Other States, and Federal land management entities, that may be significantly affected by the action or by any of the alternatives shall be notified early and their views solicited by the applicant in cooperation with the Administration. The Administration will prepare a written evaluation of any significant unresolved issues and furnish it to the applicant for incorporation into the environmental assessment (EA) or draft EIS.
    (f) In order to ensure meaningful evaluation of alternatives and to avoid commitments to transportation improvements before they are fully evaluated, the action evaluated in each EIS or finding of no significant impact (FONSI) shall:
    (1) Connect logical termini and be of sufficient length to address environmental matters on a broad scope;
    (2) Have independent utility or independent significance, i.e. , be usable and be a reasonable expenditure even if no additional transportation improvements in the area are made; and
    (3) Not restrict consideration of alternatives for other reasonably foreseeable transportation improvements.
    (g) For major transportation actions, the tiering of EISs as discussed in the CEQ regulation (40 CFR 1502.20) may be appropriate. The first tier EIS would focus on broad issues such as general location, mode choice, and areawide air quality and land use implications of the major alternatives. The second tier would address site-specific details on project impacts, costs, and mitigation measures.
    (h) For the Federal-aid highway program:
    (1) Each State must have procedures approved by the FHWA to carry out a public involvement/public hearing program pursuant to 23 U.S.C. 128 and 40 CFR parts 1500 through 1508.
    (2) State public involvement/public hearing procedures must provide for:
    (i) Coordination of public involvement activities and public hearings with the entire NEPA process.
    (ii) Early and continuing opportunities during project development for the public to be involved in the identification of social, economic, and environmental impacts, as well as impacts associated with relocation of individuals, groups, or institutions.
    (iii) One or more public hearings or the opportunity for hearing(s) to be held by the State highway agency at a convenient time and place for any Federal-aid project which requires significant amounts of right-of-way, substantially changes the layout or functions of connecting roadways or of the facility being improved, has a substantial adverse impact on abutting property, otherwise has a significant social, economic, environmental or other effect, or for which the FHWA determines that a public hearing is in the public interest.
    (iv) Reasonable notice to the public of either a public hearing or the opportunity for a public hearing. Such notice will indicate the availability of explanatory information. The notice shall also provide information required to comply with public involvement requirements of other laws, Executive orders, and regulations.
    (v) Explanation at the public hearing of the following information, as appropriate:
    (A) The project's purpose, need, and consistency with the goals and objectives of any local urban planning,
    (B) The project's alternatives, and major design features,
    (C) The social, economic, environmental, and other impacts of the project,
    (D) The relocation assistance program and the right-of-way acquisition process.
    (E) The State highway agency's procedures for receiving both oral and written statements from the public.
    (vi) Submission to the FHWA of a transcript of each public hearing and a certification that a required hearing or hearing opportunity was offered. The transcript will be accompanied by copies of all written statements from the public, both submitted at the public hearing or during an announced period after the public hearing.
    (3) Based on the reevaluation of project environmental documents required by §771.129, the FHWA and the State highway agency will determine whether changes in the project or new information warrant additional public involvement.
    (4) Approvals or acceptances of public involvement/public hearing procedures prior to the publication date of this regulation remain valid.
    (i) Applicants for capital assistance in the FTA program achieve public participation on proposed projects by holding public hearings and seeking input from the public through the scoping process for environmental documents. For projects requiring EISs, a public hearing will be held during the circulation period of the draft EIS. For all other projects, an opportunity for public hearings will be afforded with adequate prior notice pursuant to 49 U.S.C. 5323(b), and such hearings will be held when anyone with a significant social, economic, or environmental interest in the matter requests it. Any hearing on the action must be coordinated with the NEPA process to the fullest extent possible.
    (j) Information on the FTA environmental process may be obtained from: Director, Office of Human and Natural Environment, Federal Transit Administration, Washington, DC 20590. Information on the FHWA environmental process may be obtained from: Director, Office of Project Development and Environmental Review, Federal Highway Administration, Washington, DC 20590.

[52 FR 32660, Aug. 28, 1987, as amended at 70 FR 24469, May 9, 2005]

Sec. 771.113 Timing of Administration activities.

    (a) The Administration in cooperation with the applicant will perform the work necessary to complete a FONSI or an EIS and comply with other related environmental laws and regulations to the maximum extent possible during the NEPA process. This work includes environmental studies, related engineering studies, agency coordination and public involvement. However, final design activities, property acquisition (with the exception of hardship and protective buying, as defined in §771.117(d)), purchase of construction materials or rolling stock, or project construction shall not proceed until the following have been completed:
    (1)(i) The action has been classified as a categorical exclusion (CE), or
    (ii) A FONSI has been approved, or
    (iii) A final EIS has been approved and available for the prescribed period of time and a record of decision has been signed;
    (2) For actions proposed for FHWA funding, the FHWA Division Administrator has received and accepted the certifications and any required public hearing transcripts required by 23 U.S.C. 128;
    (3) For activities proposed for FHWA funding, the programming requirements of 23 CFR part 450, subpart B, and 23 CFR part 630, subpart A, have been met.
    (b) For FHWA, the completion of the requirements set forth in paragraphs (a)(1) and (2) of this section is considered acceptance of the general project location and concepts described in the environmental document unless otherwise specified by the approving official. However, such approval does not commit the Administration to approve any future grant request to fund the preferred alternative.
    (c) Letters of Intent issued under the authority of 49 U.S.C. 5309(g) are used by FTA to indicate an intention to obligate future funds for multi-year capital transit projects. Letters of Intent will not be issued by FTA until the NEPA process is completed.

[52 FR 32660, Aug. 28, 1987; 53 FR 11066, Apr. 5, 1988, as amended at 70 FR 24469, May 9, 2005]

Sec. 771.115 Classes of actions.

    There are three classes of actions which prescribe the level of documentation required in the NEPA process.
    (a) Class I (EISs). Actions that significantly affect the environment require an EIS (40 CFR 1508.27). The following are examples of actions that normally required an EIS:
    (1) A new controlled access freeway.
    (2) A highway project of four or more lanes on a new location.
    (3) New construction or extension of fixed rail transit facilities (e.g., rapid rail, light rail, commuter rail, automated guideway transit).
    (4) New construction or extension of a separate roadway for buses or high occupancy vehicles not located within an existing highway facility.
    (b) Class II (CEs). Actions that do not individually or cumulative have a significant environmental effect are excluded from the requirement to prepare an EA or EIS. A specific list of CEs normally not requiring NEPA documentation is set forth in Sec. 771.117(c). When appropriately documented, additional projects may also qualify as CEs pursuant to Sec. 771.117(d).
    (c) Class III (EAs). Actions in which the significance of the environmental impact is not clearly estabilished. All actions that are not Class I or II are Class III. All actions in this class require the preparation of an EA to determine the appropriate environmental document required.

Sec. 771.117 Categorical exclusions.

    (a) Categorical exclusions (CEs) are actions which meet the definition contained in 40 CFR 1508.4, and, based on past experience with similar actions, do not involve significnt environmental impacts. They are actions which: do not induce significant impacts to planned growth or land use for the area; do not require the relocation of significant numbers of people; do not have a significant impact on any natural, cultural, recreational, historic or other resource; do not involve significant air, noise, or water quality impacts; do not have significant impacts on travel patterns; or do not otherwise, either individually or cumulatively, have any significant environmental impacts.
    (b) Any action which normally would be classified as a CE but could involve unusual circumstances will require the Administration, in cooperation with the applicant, to conduct appropriate environmental studies to determine if the CE classification is proper. Such unusual circumstances include:
    (1) Significant environmental impacts;
    (2) Substantial controversy on environmental grounds;
    (3) Significant impact on properties protected by section 4(f) of the DOT Act or section 106 of the National Historic Preservation Act; or
    (4) Inconsistencies with any Federal, State, or local law, requirement or administrative determination relating to the environmental aspects of the action.
    (c) The following actions meet the criteria for CEs in the CEQ regulation (section 1508.4) and §771.117(a) of this regulation and normally do not require any further NEPA approvals by the Administration:
    (1) Activities which do not involve or lead directly to construction, such as planning and research activities; grants for training; engineering to define the elements of a proposed action or alternatives so that social, economic, and environmental effects can be assessed; and Federal-aid system revisions which establish classes of highways on the Federal-aid highway system.
    (2) Approval of utility installations along or across a transportation facility.
    (3) Construction of bicycle and pedestrian lanes, paths, and facilities.
    (4) Activities included in the State's highway safety plan under 23 U.S.C. 402.
    (5) Transfer of Federal lands pursuant to 23 U.S.C. 317 when the subsequent action is not an FHWA action.
    (6) The installation of noise barriers or alterations to existing publicly owned buildings to provide for noise reduction.
    (7) Landscaping.
    (8) Installation of fencing, signs, pavement markings, small passenger shelters, traffic signals, and railroad warning devices where no substantial land acquisition or traffic disruption will occur.
    (9) Emergency repairs under 23 U.S.C. 125.
    (10) Acquisition of scenic easements.
    (11) Determination of payback under 23 U.S.C. 156 for property previously acquired with Federal-aid participation.
    (12) Improvements to existing rest areas and truck weigh stations.
    (13) Ridesharing activities.
    (14) Bus and rail car rehabilitation.
    (15) Alterations to facilities or vehicles in order to make them accessible for elderly and handicapped persons.
    (16) Program administration, technical assistance activities, and operating assistance to transit authorities to continue existing service or increase service to meet routine changes in demand.
    (17) The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by new facilities which themselves are within a CE.
    (18) Track and railbed maintenance and improvements when carried out within the existing right-of-way.
    (19) Purchase and installation of operating or maintenance equipment to be located within the transit facility and with no significant impacts off the site.
    (20) Promulgation of rules, regulations, and directives.
    (d) Additional actions which meet the criteria for a CE in the CEQ regulations (40 CFR 1508.4) and paragraph (a) of this section may be designated as CEs only after Administration approval. The applicant shall submit documentation which demonstrates that the specific conditions or criteria for these CEs are satisfied and that significant environmental effects will not result. Examples of such actions include but are not limited to:
    (1) Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (e.g., parking, weaving, turning, climbing).
    (2) Highway safety or traffic operations improvement projects including the installation of ramp metering control devices and lighting.
    (3) Bridge rehabilitation, reconstruction or replacement or the construction of grade separation to replace existing at-grade railroad crossings.
    (4) Transportation corridor fringe parking facilities.
    (5) Construction of new truck weigh stations or rest areas.
    (6) Approvals for disposal of excess right-of-way or for joint or limited use of right-of-way, where the proposed use does not have significant adverse impacts.
    (7) Approvals for changes in access control.
    (8) Construction of new bus storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and located on or near a street with adequate capacity to handle anticipated bus and support vehicle traffic.
    (9) Rehabilitation or reconstruction of existing rail and bus buildings and ancillary facilities where only minor amounts of additional land are required and there is not a substantial increase in the number of users.
    (10) Construction of bus transfer facilities (an open area consisting of passenger shelters, boarding areas, kiosks and related street improvements) when located in a commercial area or other high activity center in which there is adequate street capacity for projected bus traffic.
    (11) Construction of rail storage and maintenance facilities in areas used predominantly for industrial or transportation purposes where such construction is not inconsistent with existing zoning and where there is no significant noise impact on the surrounding community.
    (12) Acquisition of land for hardship or protective purposes; advance land acquisition loans under 49 U.S.C. 5309(b). [NOTE 3: Hardship acquisition is early acquisition of property by the applicant at the property owner's request to alleviate particular hardship to the owner, in contrast to others, because of an inability to sell his property. This is justified when the property owner can document on the basis of health, safety or financial reasons that remaining in the property poses an undue hardship compared to others.] Hardship and protective buying will be permitted only for a particular parcel or a limited number of parcels. These types of land acquisition quality for a CE only where the acquisition will not limit the evaluation of alternatives, including shifts in alignment for planned construction projects, which may be required in the NEPA process. No project development on such land may proceed until the NEPA process has been completed. Protective acquisition is done to prevent imminent development of a parcel which is needed for a proposed transportation corridor or site. Documentation must clearly demonstrate that development of the land would preclude future transportation use and that such development is imminent. Advance acquisition is not permitted for the sole purpose of reducing the cost of property for a proposed project.
    (e) Where a pattern emerges of granting CE status for a particular type of action, the Administration will initiate rulemaking proposing to add this type of action to the list of categorical exclusions in paragraph (c) or (d) of this section, as appropriate.

[52 FR 32660, Aug. 28, 1987; 53 FR 11066, Apr. 5, 1988, as amended at 70 FR 24469, May 9, 2005]

Sec. 771.119 Environmental assessments.

    (a) An EA shall be prepared by the applicant in consultation with the Administration for each action that is not a CE and does not clearly require the preparation of an EIS, or where the Administration believes an EA would assist in determining the need for an EIS.
    (b) For actions that require an EA, the applicant, in consultation with the Administration, shall, at the earliest appropriate time, begin consultation with interested agencies and others to advise them of the scope of the project and to achieve the following objectives: determine which aspects of the proposed action have potential for social, economic, or environmental impact; identify alternatives and measures which might mitigate adverse environmental impacts; and identify other environmental review and consultation requirements which should be performed concurrently with the EA. The applicant shall accomplish this through an early coordination process ( i.e. , procedures under §771.111) or through a scoping process. Public involvement shall be summarized and the results of agency coordination shall be included in the EA.
    (c) The EA is subject to Administration approval before it is made available to the public as an Administration document. The FTA applicants may circulate the EA prior to Administration approval provided that the document is clearly labeled as the applicant's document.
    (d) The EA need not be circulated for comment but the document must be made available for public inspection at the applicant's office and at the appropriate Administration field offices in accordance with paragraphs (e) and (f) of this section. Notice of availability of the EA, briefly describing the action and its impacts, shall be sent by the applicant to the affected units of Federal, State and local government. Notice shall also be sent to the State intergovernmental review contacts established under Executive Order 12372.
    (e) When a public hearing is held as part of the application for Federal funds, the EA shall be available at the public hearing and for a minimum of 15 days in advance of the public hearing. The notice of the public hearing in local newspapers shall announce the availability of the EA and where it may be obtained or reviewed. Comments shall be submitted in writing to the applicant or the Administration within 30 days of the availability of the EA unless the Administration determines, for good cause, that a different period is warranted. Public hearing requirements are as described in §771.111.
    (f) When a public hearing is not held, the applicant shall place a notice in a newspaper(s) similar to a public hearing notice and at a similar stage of development of the action, advising the public of the availability of the EA and where information concerning the action may be obtained. The notice shall invite comments from all interested parties. Comments shall be submitted in writing to the applicant or the Administration within 30 days of the publication of the notice unless the Administration determines, for good cause, that a different period is warranted.
    (g) If no significant impacts are identified, the applicant shall furnish the administration a copy of the revised EA, as appropriate; the public hearing transcript, where applicable; copies of any comments received and responses thereto; and recommend a FONSI. The EA should also document compliance, to the extent possible, with all applicable environmental laws and Executive orders, or provide reasonable assurance that their requirements can be met.
    (h) When the Administration expects to issue a FONSI for an action described in §771.115(a), copies of the EA shall be made available for public review (including the affected units of government) for a minimum of 30 days before the Administration makes its final decision (See 40 CFR 1501.4(e)(2).) This public availability shall be announced by a notice similar to a public hearing notice.
    (i) If, at any point in the EA process, the Administration determines that the action is likely to have a significant impact on the environment, the preparation of an EIS will be required.

[52 FR 32660, Aug. 28, 1987, as amended at 70 FR 24470, May 9, 2005]

Sec. 771.121 Findings of no significant impact.

    (a) The Administration will review the EA and any public hearing comments and other comments received regarding the EA. If the Administration agrees with the applicant's recommendations pursuant to Sec. 771.119(g), it will make a separate written FONSI incorporating by reference the EA and any other appropriate environmental documents.
    (b) After a FONSI has been made by the Administration, a notice of availability of the FONSI shall be sent by the applicant to the affected units of Federal, State and local government and the document shall be available from the applicant and the Administration upon request by the public. Notice shall also be sent to the State intergovernmental review contacts established under Executive Order 12372.
    (c) If another Federal agency has issued a FONSI on an action which includes an element proposed for Administration funding, the Administration will evaluate the other agency's FONSI. If the Administration determines that this element of the project and its environmental impacts have been adequately identified and assessed, and concurs in the decision to issue a FONSI, the Administration will issue its own FONSI incorporating the other agency's FONSI. If environmental issues have not been adequately identified and assessed, the Administration will require appropriate environmental studies.

Sec. 771.123 Draft environmental impact statements.
    (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause significant impacts on the environment. When the decision has been made by the Administration to prepare an EIS, the Administration will issue a Notice of Intent (40 CFR 1508.22) for publication in theFederal Register.Applicants are encouraged to announce the intent to prepare an EIS by apprpriate means at the local level.
    (b) After publication of the Notice of Intent, the Administration, in cooperation with the applicant, will begin a scoping process. The scoping process will be used to identify the range of alternatives and impacts and the significant issues to be addressed in the EIS and to achieve the other objectives of 40 CFR 1501.7. For FHWA, scoping is normally achieved through public and agency involvement procedures required by §771.111. For FTA, scoping is achieved by soliciting agency and public responses to the action by letter or by holding scoping meetings. If a scoping meeting is to be held, it should be announced in the Administration's Notice of Intent and by appropriate means at the local level.
    (c) The draft EIS shall be prepared by the Administration in cooperation with the applicant or, where permitted by law, by the applicant with appropriate guidance and participation by the Administration. The draft EIS shall evaluate all reasonable alternatives to the action and discuss the reasons why other alternatives, which may have been considered, were eliminated from detailed study. The draft EIS shall also summarize the studies, reviews, consultations, and coordination required by environmental laws or Executive orders to the extent appropriate at this stage in the environmental process.
    (d) An applicant which is a statewide agency may select a consultant to assist in the preparation of an EIS in accordance with applicable contracting procedures. Where the applicant is a joint lead or cooperating agency, the applicant may select a consultant, after coordination with the Administration to assure compliance with 40 CFR 1506.5(c). The Administration will select any such consultant for other applicants. (See §771.109(c) for definitions of these terms.)
    (e) The Administration, when satisfied that the draft EIS complies with NEPA requirements, will approve the draft EIS for circulation by signing and dating the cover sheet.
    (f) A lead, joint lead, or a cooperating agency shall be responsible for printing the EIS. The initial printing of the draft EIS shall be in sufficient quantity to meet requirements for copies which can reasonably be expected from agencies, organizations, and individuals. Normally, copies will be furnished free of charge. However, with Administration concurrence, the party requesting the draft EIS may be charged a fee which is not more than the actual cost of reproducing the copy or may be directed to the nearest location where the statement may be reviewed.
    (g) The draft EIS shall be circulated for comment by the applicant on behalf of the Administration. The draft EIS shall be made available to the public and transmitted to agencies for comment no later than the time the document is filed with the Environmental Protection Agency in accordance with 40 CFR 1506.9. The draft EIS shall be transmitted to:
    (1) Public officials, interest groups, and members of the public known to have an interest in the proposed action or the draft EIS;
    (2) Federal, State and local government agencies expected to have jurisdiction or responsibility over, or interest or expertise in, the action. Copies shall be provided directly to appropriate State and local agencies, and to the State intergovernmental review contacts established under Executive Order 12372; and
    (3) States and Federal land management entities which may be significantly affected by the proposed action or any of the alternatives. These copies shall be accompanied by a request that such State or entity advise the Administration in writing of any disagreement with the evaluation of impacts in the statement. The Administration will furnish the comments received to the applicant along with a written assessment of any disagreements for incorporation into the final EIS.
    (h) The FTA requires a public hearing during the circulation period of all draft EISs. FHWA public hearing requirements are as described in §771.111(h). Whenever a public hearing is held, the draft EIS shall be available at the public hearing and for a minimum of 15 days in advance of the public hearing. The availability of the draft EIS shall be mentioned, and public comments requested, in any public hearing notice and at any public hearing presentation. If a public hearing on an action proposed for FHWA funding is not held, a notice shall be placed in a newspaper similar to a public hearing notice advising where the draft EIS is available for review, how copies may be obtained, and where the comments should be sent.
    (i) TheFederal Registerpublic availability notice (40 CFR 1506.10) shall establish a period of not less than 45 days for the return of comments on the draft EIS. The notice and the draft EIS transmittal letter shall identify where comments are to be sent.
    (j) For FTA funded major urban mass transportation investments, the applicant shall prepare a report identifying a locally preferred alternative at the conclusion of the Draft EIS circulation period. Approval may be given to begin preliminary engineering on the principal alternative(s) under consideration. During the course of such preliminary engineering, the applicant will refine project costs, effectiveness, and impact information with particular attention to alternative designs, operations, detailed location decisions and appropriate mitigation measures. These studies will be used to prepare the final EIS or, where appropriate, a supplemental draft EIS.

[52 FR 32660, Aug. 28, 1987, as amended at 70 FR 24470, May 9, 2005]

Sec. 771.125 Final environmental impact statements.

    (a)(1) After circulation of a draft EIS and consideration of comments received, a final EIS shall be prepared by the Administration in cooperation with the applicant or, where permitted by law, by the applicant with appropriate guidance and participation by the Administration. The final EIS shall identify the preferred alternative and evaluate all reasonable alternatives considered. It shall also discuss substantive comments received on the draft EIS and responses thereto, summarize public involvement, and describe the mitigation measures that are to be incorporated into the proposed action. Mitigation measures presented as commitments in the final EIS will be incorporated into the project as specified in §771.109(b). The final EIS should also document compliance, to the extent possible, with all applicable environmental laws and Executive orders, or provide reasonable assurance that their requirements can be met.
    (2) Every reasonable effort shall be made to resolve interagency disagreements on actions before processing the final EIS. If significant issues remain unresolved, the final EIS shall identify those issues and the consultations and other efforts made to resolve them.
    (b) The final EIS will be reviewed for legal sufficiency prior to Administration approval.
    (c) The Administration will indicate approval of the EIS for an action by signing and dating the cover page. Final EISs prepared for actions in the following categories will be submitted to the Administration's Headquarters for prior concurrence:
    (1) Any action for which the Administration determines that the final EIS should be reviewed at the Headquarters office. This would typically occur when the Headquarters office determines that (i) additional coordination with other Federal, State or local governmental agencies is needed; (ii) the social, economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of the proposed action are unusually great; (iv) major issues remain unresolved; or (v) the action involves national policy issues.
    (2) Any action to which a Federal, State or local government agency has indicated opposition on environmental grounds (which has not been resolved to the written satisfaction of the objecting agency).
    (3) Major urban mass transportation investments as defined by FTA's regulation on major capital investment projects (49 CFR part 611).
    (d) The signature of the FTA approving official on the cover sheet also indicates compliance with 49 U.S.C. 5324(b) and fulfillment of the grant application requirements of 49 U.S.C. 5323(b).
    (e) Approval of the final EIS is not an Administration Action (as defined in §771.107(c)) and does not commit the Administration to approve any future grant request to fund the preferred alternative.
    (f) The initial printing of the final EIS shall be in sufficient quantity to meet the request for copies which can be reasonably expected from agencies, organizations, and individuals. Normally, copies will be furnished free of charge. However, with Administration concurrence, the party requesting the final EIS may be charged a fee which is not more than the actual cost of reproducing the copy or may be directed to the nearest location where the statement may be reviewed.
    (g) The final EIS shall be transmitted to any persons, organizations, or agencies that made substantive comments on the draft EIS or requested a copy, no later than the time the document is filed with EPA. In the case of lengthy documents, the agency may provide alternative circulation processes in accordance with 40 CFR 1502.19. The applicant shall also publish a notice of availability in local newspapers and make the final EIS available through the mechanism established pursuant to DOT Order 4600.13 which implements Executive Order 12372. When filed with EPA, the final EIS shall be available for public review at the applicant's offices and at appropriate Administration offices. A copy should also be made available for public review at institutions such as local government offices, libraries, and schools, as appropriate.

[52 FR 32660, Aug. 28, 1987, as amended at 70 FR 24470, May 9, 2005]

Sec. 771.127 Record of decision.

    (a) The Administration will complete and sign a record of decision (ROD) no sooner than 30 days after publication of the final EIS notice in theFederal Register or 90 days after publication of a notice for the draft EIS, whichever is later. The ROD will present the basis for the decision as specified in 40 CFR 1505.2, summarize any mitigation measures that will be incorporated in the project and document any required Section 4(f) approval in accordance with part 774 of this chapter. Until any required ROD has been signed, no further approvals may be given except for administrative activities taken to secure further project funding and other activities consistent with 40 CFR 1506.1.
    (b) If the Administration subsequently wishes to approve an alternative which was not identified as the preferred alternative but was fully evaluated in the final EIS, or proposes to make substantial changes to the mitigation measures or findings discussed in the ROD, a revised ROD shall be subject to review by those Administration offices which reviewed the final EIS under §771.125(c). To the extent practicable the approved revised ROD shall be provided to all persons, organizations, and agencies that received a copy of the final EIS pursuant to §771.125(g).

[52 FR 32660, Aug. 28, 1987, as amended at 73 FR 13395, Mar. 12, 2008]

Sec. 771.129 Re-evaluations.

    (a) A written evaluation of the draft EIS shall be prepared by the applicant in cooperation with the Administration if an acceptable final EIS is not submitted to the Administration within 3 years from the date of the draft EIS circulation. The purpose of this evaluation is to determine whether or not a supplement to the draft EIS or a new draft EIS is needed.
    (b) A written evaluation of the final EIS will be required before further approvals may be granted if major steps to advance the action (e.g., authority to undertake final design, authority to acquire a significant portion of the right-of-way, or approval of the plans, specifications and estimates) have not occurred within three years after the approval of the final EIS, final EIS supplement, or the last major Administration approval or grant.
    (c) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major approvals or grants to establish whether or not the approved environmental document or CE designation remains valid for the requested Administration action. These consultations will be documented when determined necessary by the Administration.

[52 FR 32660, Aug. 28, 1987; 53 FR 11066, Apr. 5, 1988]

Sec. 771.130 Supplemental environmental impact statements.

    (a) A draft EIS, final EIS, or supplemental EIS may be supplemented at any time. An EIS shall be supplemented whenever the Administration determines that:
    (1) Changes to the proposed action would result in significant environmental impacts that were not evaluated in the EIS; or
    (2) New information or circumstances relevant to environmental concerns and bearings on the proposed action or its impacts would result in significant environmental impacts not evaluated in the EIS.
    (b) However, a supplemental EIS will not be necessary where:
    (1) The changes to the proposed action, new information, or new circumstances result in a lessening of adverse environmental impacts evaluated in the EIS without causing other environmental impacts that are significant and were not evaluated in the EIS; or
    (2) The Administration decides to approve an alternative fully evaluated in an approved final EIS but not identified as the preferred alternative. In such a case, a revised ROD shall be prepared and circulated in accordance with §771.127(b).
    (c) Where the Administration is uncertain of the significance of the new impacts, the applicant will develop appropriate environmental studies or, if the Administration deems appropriate, an EA to assess the impacts of the changes, new information, or new circumstances. If, based upon the studies, the Administration determines that a supplemental EIS is not necessary, the Administration shall so indicate in the project file.
    (d) A supplement is to be developed using the same process and format (i.e., draft EIS, final EIS, and ROD) as an original EIS, except that scoping is not required.
    (e) A supplemental draft EIS may be necessary for FTA major urban mass transportation investments if there is a substantial change in the level of detail on project impacts during project planning and development. The supplement will address site-specific impacts and refined cost estimates that have been developed since the original draft EIS.
    (f) In some cases, a supplemental EIS may be required to address issues of limited scope, such as the extent of proposed mitigation or the evaluation of location or design variations for a limited portion of the overall project. Where this is the case, the preparation of a supplemental EIS shall not necessarily:
    (1) Prevent the granting of new approvals;
    (2) Require the withdrawal of previous approvals; or
    (3) Require the suspension of project activities; for any activity not directly affected by the supplement. If the changes in question are of such magnitude to require a reassessment of the entire action, or more than a limited portion of the overall action, the Administration shall suspend any activities which would have an adverse environmental impact or limit the choice of reasonable alternatives, until the supplemental EIS is completed.

[52 FR 32660, Aug. 28, 1987, as amended at 70 FR 24470, May 9, 2005]

Sec. 771.131 Emergency action procedures.

    Requests for deviations from the procedures in this regulation because of emergency circumstances (40 CFR 1506.11) shall be referred to the Administration's headquarters for evaluation and decision after consultation with CEQ.

Sec. 771.133 Compliance with other requirements.

    The final EIS or FONSI should document compliance with requirements of all applicable environmental laws, Executive orders, and other related requirements. If full compliance is not possible by the time the final EIS or FONSI is prepared, the final EIS or FONSI should reflect consultation with the appropriate agencies and provide reasonable assurance that the requirements will be met. Approval of the environmental document constitutes adoption of any Administration findings and determinations that are contained therein. The FHWA approval of the appropriate NEPA document will constitute its finding of compliance with the report requirements of 23 U.S.C. 128.

Sec. 771.137 International actions.

    (a) The requirements of this part apply to:
    (1) Administration actions significantly affecting the environment of a foreign nation not participating in the action or not otherwise involved in the action.
    (2) Administration actions outside the U.S., its territories, and possessions which significantly affect natural resources of global importance designated for protection by the President or by international agreement.
    (b) If communication with a foreign government concerning environmental studies or documentation is anticipated, the Administration shall coordinate such communication with the Department of State through the Office of the Secretary of Transportation.