When we first entered this building, it was evident that years of neglect had taken its toll. Water leakage through large holes in the roof damaged ceilings, walls, seats, and virtually every interior finish. The only solution was to gut the inside of the building to exposed brick walls and roof trusses, then rebuild and reinforce the roof. Complete new electrical, air conditioning, and plumbing systems replaced vandalized or obsolete ones.

The building was a mess!
The seats were damaged beyond repair.
Damage to the building was extensive. This shows a wall with the original artwork.
This is the staircase that leads to the second floor balcony.
The concession area.
The stage during early renovation.
The balcony, which is closed until Phase 2 of renovation.
Construction of the new stage floor.