^ Another shot from the back yard looking to the street.
We met with the builder on September 28. He told us the timeline for getting the house built and went over the plans and things.
He says the slab will probably be poured by next week, then maybe 2 and a half months until the house is finished.
We weren't planning on moving in until June, but at this rate the house will be done around January, if not late December.
We were originally told it would be done in March.
Yep, we now have our pvc pipe down, almost ready for the concrete to be poured.
Corner angle.
Next
Back
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17