

|
The Elevator spar and ribs are painted with zinc chromate on my driveway.
At this point the pieces have all been fitted and drilled and marked as to position.
(You can see some of my scribbling on them.)
August 21, 2006
The assembled elevator skeleton on my
driveway. I would have assembled it in my shop but the
light is so much better out here.<--(old joke)
August 22, 2006 |  |
 | This shot shows the left pivot post. (Yes, I know it's upside down.)
August 22, 2006
|
Here is a typical nose rib installation.
August 22, 2006 |  |
 | Here is the rear skin
in the process of being fitted to the
elevator skeleton.
August 27, 2006
|