Back to Site Map

    We've moved the desk out of the room (left side of pic) and ripped out the mountain area which was not yet finished and expanded the table to take over the whole room.  The new table is "C" shaped with a center work area "Bay"  Access to the center will be through the opening of the "C" by ducking under a couple bridges.  I've ripped out the about 1/2 of the structure shown in the original layout picture and built the new framework and tables.  We've completed the oak fronts and drape.  I have ordered and installed 75' of new track and roadbed on order along with lots of switches and a motorized Bascule bridge.  Here are some progression pictures of the  new tables:

Out with the old..........................in with the new........................almost ready............................READY!

rippedout.JPG (55752 bytes)    newframe.jpg (57119 bytes)    newtables.JPG (60417 bytes)    Table_ready.JPG (57758 bytes)

 

Left side of layout, mountain started & tunnels in!                                  Right Side of layout with bridge, yard, roundhouse and  turntable.  

                                                                                                            This was the original side and the town stayed intact through the

                                                                                                             expansion/remodel.

   

The start of the riverbed!                                                    The roundhouse & turntable!

 

   

The small yard!                                                                                Our bridge.

Tunnels under construction.