INJECTION MOULDING PROCESS

The moulding process refers to shaping of plastic melt inside the mould. This involves

Sequence in the process

Important note

During filling phase, pressure value should be set 15-25 bar above the actual pressure encountered in the cavity. This is because if the relief valve is actuated during the filling phase, oil would drain and you loss control over the speed. In case of doubt, it is ok to set value at about 80% of maximum pressure for the machine through out the filling phase. The value of maximum hydraulic system pressure is recommended in the manual. To maintain the constant melt front velocity, it is required to adjust the injection speed in stroke dependent multiple steps.

During pressure phase, the filling speed is low and constant through out the pressure phase and pressure can be adjusted in time dependent multiple steps to avoid moulded-in stress.

SETTING POSITION SPEED AND PRESSURE

cavity pressure profile

PRINCIPLE for SETTING OF INJECTION SPEED, PRESSURE AND POSITION

POSITION

SPEED

PRESSURE

FILLING PHASE

Also known as Speed phase.

Select end of 1st step and start of 2nd step.

Set SPEED 1

Try to set high.

Only one pressure setting is required during FILLING PHASE.

Pressure Setting should be more than actual filling pressure. as relief valve should not be actuated. If it is actuated, then speed control will be lost.

Filling pressure depends on resistance to move the melt. It depends on flow ratio and viscosity of melt.

Also known as Speed phase.

There may be no. of steps available on machine.

Select end of 2nd step and start of 3rd step

Set SPEED 2

Lower speed for crossing narrow passage / gate

Steps are position controlled.

Select end of 3rd step and start of SWITCH OVER POINT. This point is at around 80-95% of the injection stroke.

Set SPEED 3

Reduce to lower sink mark / increase to shift weld line.

PRESSURE PHASE-

Holding phase.

There may be no. of steps available on machine.

Timer controls the Holding pressure steps if available on machine.

Holding pressure time for step 1 is set on a timer,

Set SPEED low value say up to 35% not more.

This can be one step of speed for different Holding steps.

Speed set is low, as there is less or no space to move the melt.

 

Holding pressure 1 set just enough to fill cavity without overpacking.

Steps are timers controlled.

Holding pressure time for step 2 is set on a timer,

Holding pressure 2 set just enough to fill cavity without overpacking.

 

Holding pressure time for step 3 is set on a timer,

Holding pressure 3 set just enough to fill cavity without overpacking.