Perunding
Bakti's
professional expertise include in field of water resources engineering
in relation to flood mitigation, damage and irrigation infrastructure.
Our experience in this field includes the the Kemasin-Semarak integraded
Rural Development project, one of Malaysia's largest drainage flood mitigation
works.
In
flood
migitation, we design and supervise construction of the following:
River
works -
Canalization and bunding, river
diversions and river clousers
Hydraulic
Structure - Break waters at river
mouth, dam, pum stations
road/ bridge crossing,
spilways and tidal
For
drainage and irrigation infrasturucture, the Firms plans,designs
and performs site supervision of :
Canal
and drainage system
- Conveyance
canals and
draining water
ways.
Hydraulic
structures - waterway crossing
farm-roads, headworks,
offtakes, pumping stations
siphons, sprinkle and water
control structures.
Example
of our work in Flood Migitation.
Drainage
And Irrigation Infrastructure Works
Kemasin-Semerak
Intergrated Rural Development Project was desined to provide drainage,
irrigation and flood mitigation facilities to the farmers in Bachok, Kota
Bharu
and
Pasir Puteh, Kelantan. This region has a population of 160,000 and covers
68,350 hectares. The Project is develop by Jabatan Parit dan Taliair and
its estimated cost is RM 400 million. It is partly financed by Asian Development
Bank.
Perunding
Bakti provided the detailed plans, design and supervised the construction
with other local overseas consultants.
The
scope of work covers :
-
Flood
Mitigation
-
Breakwaters
at River Mouth
-
River
Diversion Works
-
River
Improvement Works
-
River
Mouth protection Works
-
Tidal
Gates
-
Bunding
to Tribuaries
-
Storage
Reservoirs
-
Drainage
Pump Stations
-
Drainage
And Irrigation
-
Mangrove
Bulk Drainage
-
Irrigation
and Drainage Sub-Projects
-
Kemubu
Main Pump Station and Conveyance Structure.
|