Built by Ohio Pole Building Co.
Granville, Ohio
October 1999
|
The first day.
|
The second day.
|
The third day.
|
All done except the overhead doors.
|
Finished in seven days.
|
February 5, 2000
|
The building is 32' x 32' with a 10' ceiling on the first floor.
The second floor is 15'3" x 32' with a 9' ceiling.
The main door is 9'H x 16'W and the side door is 7'H x 8'W.
|