Log Flume Page 2

The Log Flume Page 2.

The The log flume breaker room is built and the entrance and exit ramps are installed

The The main pool if filled with water and the loading station is coming together, end of March 1970

The pier is about to open for the season. The water is running through the channels and decorative wood paneling is put up along the low channel, April 1970

The The pier is opened and the Log Flume is undergoing test runs

Loading more boats into the water

Bud and Guy Hunt take a test ride, the attraction is almost ready to open to the public, May 1970

The new “$400,000 Super Ride!” opens May, 1970

A first person look at a boat on the of the lift hill

A first person look at the turn

Looking down the drop from the first person view

A photo taken from the top of the lift hill looking towards the snaking river before the drop

September, 1971

The sign reads “IF LOG BOAT SHOULD STOP … DO NOT GET OUT! STAY IN LOG!” August, 1974

The lumberjack was moved from the Jungle Land roof and added to the flume, September, 1973

September, 1973

1975

Log Flume Page One

Log Flume Page One

Log Flume Removal 2000

Log Flume Removal 2000

Hunt's Pier Main Page

Hunt's Pier Main Page

MrBoardwalk Main Menu

MrBoardwalk Main Menu