This is what I did in Atlanta for the two months that I was there. Besides getting a nasty burn on my leg, I installed relay racks, AC wiring, setup Marconi DC powerplant, installed misc. hardware (i.e. rectifiers, DSX3 panels, FDPs), terminated fiber, placed battery strings, ran DC power, and configured a timing source. Here is what everything looks like now that it is done. I have to go back in a couple of weeks to finish wiring the DSX3 cable. Hopefully it will be my last trip out there. Click on the image for a larger view.
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Home