Table of Contents
CNT FINAL PROJECT
CNT FINAL PROJECT
Bow River Medical Centre
Bow River Medical Centre
Medical Centre Design
Medical Centre Design
Network Assessment
Design Concept
Medical Centre Design
Network Administration
Training Support
KENONIC CONTROL SYSTEMS
Kenonic Control Systems
CNT PROJECT PRESENTATION
Fluke Network Inspector
Fluke Network Inspector
Results for Kenonic
Approach and Timeline
Fluke Network Inspector Evaluation
Network Analysis
Network Analysis
Overview of Information
Interface Reports
Interface Reports
Error Reports - 885 Total
Access Reports
Additional Information
Conclusion
Lessons Learned
CNT FINAL PROJECT
CNT FINAL PROJECT
|
Author: Aaronic
|