Construction of a loading elevator

          The idea of constructing a loading elevator is almost 40 years old and there is a space left for it, but its realization wasn`t possible because of the lack of finances until two months ago. In February we made a contact with the Embassy of the United Kingdom in order to ask for financial support for such a project.Fortunately they expressed their willingness for cooperation and after that we made a written application in which we gave details of our needs. The application was accepted as an absolute need for constructing the elevator for our Center. The citizen also admired the idea of such a project. As soon as the donation was granted we approached to its realization.

        MakLift- Skopje takes part in the realization of this project as a constructor  as well as a donor of part of the finances. The elevator is in the process of fitting and we hope it`s going to be finished in the period of ten days .

        In the name of the employed in the Medical Center as well as the citizens of municipality  of Kriva Palanka  and Rankovce we would like to express our gratitude to  The Embassy of The United Kingdom .

 

Gasification 

 

We have made a project for gasification of the Hospital  Section of the out-patient `s department that includes the following systems:

-         System for central supplying with oxygen 

-         Nitric Oxide

-         Compressed air

-         Vacuum system

At the moment we are trying to find a donor that would take part in the financial part of the process of realization of this project.

 

Chemo dialysis

         The need  for construction of a  Chemo-dialysis  center in the frames of  our Medical Center exists for many years. We have the support of the Ministry of Health but we haven`t got financial support to realize it .There are 22 patients who travel about 120 km to the Medical center in Kumanovo three times a week for dialysis therapy and they are exposed on stress  all the time. With this problem the international comuunity is informed anf hopefully we will solve this problem in near future.

 

Central heating

       One of the priorities of the managing team of the Medical Center is reconstruction of the Central heating system. The existing system was built 40 years ago but as result of the construction of the building and enduring  it`s becoming useless.  The project for its reconstruction is in process of making and we hope to find a donor for its realization.

 

 

 

*
*
1.The Lift
2.
Chemo dialysis
3.Gasification
4. Central Heating
5.Computerisation

 