| Name Of Plant | GasQuantity | GasPurity | Product Pr. |
|---|---|---|---|
| 1. AO 80 | 275 Cu.M./Hr. | 96% | 0.1 Kg/cm2 |
| 2. AO 80 | 250 Cu.M./Hr. | 99.5% | 0.1 Kg/cm2 |
| 3. AO 100 | 450 Cu.M./Hr. | 96% | 0.1 Kg/cm2 |
| 4. AO 100 | 400 Cu.M./Hr. | 99.5% | 0.1 Kg/cm2 |
| 5. AO 200 | 700 Cu.M./Hr. | 99.5% | 0.1 Kg/cm2 |
| 6. AO 200 | 400 Cu.M./Hr. | 99.9% | 0.1 Kg/cm2 |
| Details | AO 80 | AO 100 | AO 200 |
|---|---|---|---|
| Air Pressure Starting | 55 Kgs/cm2 | 55 Kgs/cm2 | 55 Kgs/cm2 |
| Air Pressure Normally | 35 Kgs/cm2 | 35 Kgs/cm2 | 35 Kgs/cm2 |
| Starting Time (After Defrost) | 7 Hours | 5-6 Hours | 5 Hours |
| Defrost Time | 8 Hours | 8 Hours | 8 Hours |
| Defrosting Cycle at normal conditions | 6 Months | 9 Months | 9 Months |
| Cylinder Filling Manifold Connections | 2 x 10 Nos. | 2 x 12 Nos. | 2 x 24 Nos. |
| Cooling Water Requirement | 15 Cu.m./hr | 20 Cu.m./hr | 50 Cu.m./hr |
| Inlet Cooling Water Temperature | 25 C | 25 C | 25 C |
| Total Weight Approx. | 26 Tons | 29 Tons | 50 Tons |
| Assembly Height | 7.6 Metres | 8 Metres | 10.5 Metres |
| Maximum Roof Height | 9 Meters | 10 Meters | 12 Meters |
| Area Required | 15 Metres x 12 Metres | 15 Metres x 12 Metres | 35 Metres x 15 Metres |
| Air Input | 444 N cu.m./hr. | 550 N cu.m./hr. | 1200 N cu.m./hr. |
| Power Supply Required | 400 Volts & 230 Volts | 400 Volts & 230 Volts | 400 Volts & 230 Volts |
| ALPHA OVERSEAS REGISTERED OFFICE: B-52, Rama Road Industrial Area, Najafgarh Road, New Delhi - 110015 Tel: (91-11) 9212246801 E-mail: alphaoverseas8@yahoo.com |