2003:02:16 13:38:11 Other side of the jig. I had just enough room to walk to the door on the right, and to walk around. 213.47 Kb
|
|
 |
2003:02:16 13:38:22 The removable epoxy station. I kept moving this around to a place were it wasn't in the way. All things for epoxy-ing are on, cups, poxy, gloves, mixing sticks, filler, and some brushes. For brushing the poxy I used throw-away foam brushes (very cheap!) After some time (like 10 minutes) they fall apart but that is no problem as you are usually finished, and otherwise you take a new one. 221.42 Kb
|
|
 |
2003:02:17 19:35:10 Doubles are up. The piece on the bottom doubler goes up the side later. 200.29 Kb
|
|
 |
2003:02:20 20:23:01 Glueing the girder. Try if it fits first. 211.94 Kb
|
|
 |
2003:02:20 20:23:20 Ready for a girder. I filed out the holes in the bulkheads so they tight fit the girder. 190.06 Kb
|
|