- Chevron Canada Limited
- Project Manager for the complete engineering on the new 100,000 Ib/h Waste Heat Boiler (WHB) constructed in the operating plant of Chevron Canada, at the Burnaby Refinery. Engineering management tasks included the equipment design, review of vendor designs, bid specification for ancillary equipment, evaluation of tenders, and award. Project tasks included cost tracking, change of scope identification, scheduling, and client interface and deficiency resolution for equipment and design problems. total project value was $8.0MM
Project Manager for the design and fabrication of a new 250-ft freestanding exhaust stack for the Burnaby Refinery Fluidized Catalytic Cracker (FCC). The stack is the tallest structure in the Burnaby Refinery, has a continuous diameter of 10ft and was erected and commissioned in an operating facility. The management of engineering also included the design and fabrication of all breeching to tie-in the existing system to the FCC and removal of the old 150-ft exhaust stack. As with the Waste Heat Boiler project, the manager position was responsible for the coordination of equipment design, bid specification evaluation and award of tenders and project cost tracking, scheduling and client interface. Total project value was $1.8MM
- Rayonier Specialty Pulp Products
- Project Manager for the design of a Pulp Mill Power Boiler Bark Bin capable of supplying three boilers simultaneously. Duties included the coordination of staff to design and specify the equipment, review of all drawings, project scheduling and costing for the design engineering firm. The position required a long distance client interface to resolve drawing comments and client vendor preferences that resulted in travel as required, to complete the project. Extensive on-site field work was required to address and resolve foundation problems that developed due to incorrect mill drawings of below grade piping lines. Total project value was approximately $1.3MM
Project manager for the project analysis, boiler design, cost estimate and schedule for several power boiler rehabilitation studies within the Utilities Department of the Pulp Mill. Responsibilities included the bid specification, tender issues (with drawings), bid evaluation, project cost estimates and schedule generation. Total project value was approximately $250,000